Part E1 Fire fighting equipment
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/part-e1-fire
Performance Requirements
EP1.1 Fire hose reels
A fire hose reel system must be installed to the degree necessary to allow occupants to safely undertake initial attack on a fire appropriate to—
(a)
the size of the fire compartment; and
(…
Part E1 Fire fighting equipment
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
Performance Requirements
EP1.1 Fire hose reels
A fire hose reel system must be installed to the degree necessary to allow occupants to safely undertake initial attack on a fire appropriate to—
(a)
the size of the fire compartment; and
(…
Part E1 Fire Fighting Equipment (Performance Requirements)
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
PERFORMANCE REQUIREMENTS
EP1.1
A fire hose reel system must be installed to the degree necessary to allow occupants to safely undertake initial attack on a fire appropriate to—
(a)
the size of the fire compartment; and
(b)
the…
Part E1 Fire Fighting Equipment (Performance Requirements)
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting
PERFORMANCE REQUIREMENTS
EP1.1
A fire hose reel system must be installed to the degree necessary to allow occupants to safely undertake initial attack on a fire appropriate to—
(a)
the size of the fire compartment; and
(b)
the…
Part A0 Application
/editions/2016-a1/ncc-2016-volume-one/section-general-requirements/part-a0-application
A0.1 Compliance with the NCC
Compliance with the NCC is achieved by satisfying the Performance Requirements.
Intent
To state how to comply with the NCC.
To comply with the NCC, a solution must achieve compliance with the Performance…
Part A0 Application
/editions/2016/ncc-2016-volume-one/section-general-requirements/part-a0-application
A0.1 Compliance with the NCC
Compliance with the NCC is achieved by satisfying the Performance Requirements.
Intent
To state how to comply with the NCC.
To comply with the NCC, a solution must achieve compliance with the Performance…
Section B Water services
/editions/2019-a1/ncc-2019-volume-three-amendment-1/victoria/section-b-water-services
Part B1 Cold water services
Delete Introduction to this Part and insert Vic Introduction to this Part as follows:
Vic Introduction to this Part
Vic Introduction to this Part
This Part sets out the…
Section B Water services
/editions/2019/ncc-2019-volume-three/victoria/section-b-water-services
Part B1 Cold water services
Delete Introduction to this Part and insert Vic Introduction to this Part as follows:
Vic Introduction to this Part
Vic Introduction to this Part
This Part sets out the requirements for the design, construction,…
Part H3 Farm Buildings And Farm Sheds
/editions/2016/ncc-2016-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and-farm
Note
Note.
Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D,E and F for farm buildings and farm sheds.
H3.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply…
Part H3 Farm Buildings And Farm Sheds
/editions/2016-a1/ncc-2016-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and
Note
Note.
Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D,E and F for farm buildings and farm sheds.
H3.1 Application of Part
(a)
The Deemed-to-Satisfy Provisions of this Part apply…
Part B4 Fire-Fighting Water Service (Performance Requirements)
/editions/2016-a1/ncc-2016-volume-three/section-b-water-services/part-b4-fire-fighting-water-service
NSW B4
NT B4
QLD B4
B4.0 Scope
This Part sets out requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a fire-fighting water service from the point of connection or…
Part B4 Fire-Fighting Water Service (Performance Requirements)
/editions/2016/ncc-2016-volume-three/section-b-water-services/part-b4-fire-fighting-water-service
NSW B4
NT B4
QLD B4
B4.0 Scope
This Part sets out requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a fire-fighting water service from the point of connection or…
Part B4 Fire-Fighting Water Service (Deemed-to-Satisfy)
/editions/2016-a1/ncc-2016-volume-three/section-b-water-services/part-b4-fire-fighting-water-service
B4.1 Deemed-to-Satisfy Provisions
Performance RequirementBP4.1 is satisfied by complying with B4.2.
B4.2 General requirements
(a)
Fire-fighting water services for buildings and structures to which NCC Volume One applies must comply with…
Part B4 Fire-Fighting Water Service (Deemed-to-Satisfy)
/editions/2016/ncc-2016-volume-three/section-b-water-services/part-b4-fire-fighting-water-service
B4.1 Deemed-to-Satisfy Provisions
Performance RequirementBP4.1 is satisfied by complying with B4.2.
B4.2 General requirements
(a)
Fire-fighting water services for buildings and structures to which NCC Volume One applies must comply with…
Part H3 Farm buildings and farm sheds
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-h-special-use-buildings/part-h3-farm
Note:
Note:
Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E and F for farm buildings and farm sheds
H3.1 Application of Part
SA Part H3
(a)
The Deemed-to-Satisfy Provisions…
Part H3 Farm buildings and farm sheds
/editions/2019/ncc-2019-volume-one/section-h-special-use-buildings/part-h3-farm-buildings-and-farm
Note:
Note:
Part H3 contains Deemed-to-Satisfy Provisions additional to those contained in Sections C, D, E and F for farm buildings and farm sheds
H3.1 Application of Part
SA Part H3
(a)
The Deemed-to-Satisfy Provisions…
Specification J5.2b Ductwork Insulation and Sealing
/editions/2016/ncc-2016-volume-one/section-j-energy-efficiency/specification-j52b-ductwork
1. Scope
(a)
This Specification contains the requirements for the sealing and insulating of supply and return ductwork and fittings used in an air-conditioning system.
(b)
For the purposes of this Specification, fittings—
(i)…
Specification J5.2b Ductwork Insulation and Sealing
/editions/2016-a1/ncc-2016-volume-one/section-j-energy-efficiency/specification-j52b-ductwork
1. Scope
(a)
This Specification contains the requirements for the sealing and insulating of supply and return ductwork and fittings used in an air-conditioning system.
(b)
For the purposes of this Specification, fittings—
(i)…
Part B4 Fire-fighting water services
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-b-water-services/part-b4-fire-fighting
NSW B4
NT B4
Qld B4
Introduction to this Part
This Part sets out requirements for the design, construction, installation,…
Part B4 Fire-fighting water services
/editions/2019/ncc-2019-volume-three/section-b-water-services/part-b4-fire-fighting-water-services
NSW B4
NT B4
Qld B4
Introduction to this Part
This Part sets out requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a fire-fighting water service…