/editions/2019/ncc-2019-volume-three/section-b-water-services/part-b5-cross-connection-control
Introduction to this Part
This Part sets out cross-connection hazards and corresponding Hazard Ratings.
Explanatory information:
Explanatory information:
OBJECTIVE
BO5
The Objective of this Part is to—
safeguard people from…
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-b-water-services/part-b5-cross
Introduction to this Part
This Part sets out cross-connection hazards and corresponding Hazard Ratings.
Explanatory information:
Explanatory information:
OBJECTIVE…
/editions/2016/ncc-2016-volume-three/section-general-provisions/part-a3-documents-adopted-reference
A3.1 Schedule of referenced documents
ACT, SA, Tas
The Standards and other documents listed in Table A3.1 are referred to in the PCA.
Table A3.1 SCHEDULE OF REFERENCED DOCUMENTS
Document No.
Date
Title
PCA Clause
AS 1056
Storage water…
/editions/2016/ncc-2016-volume-three/queensland/section-b-water-services
Part B1 Cold Water Services
Delete B1.2(a) and (c) and insert Qld B1.2(a) and (c) as follows:
Qld B1.2 General requirements
(a)
The design, construction, installation, replacement, repair, alteration and maintenance of cold water services…
/editions/2016-a1/ncc-2016-volume-three/queensland/section-b-water-services
Part B1 Cold Water Services
Delete B1.2(a) and (c) and insert Qld B1.2(a) and (c) as follows:
Qld B1.2 General requirements
(a)
The design, construction, installation, replacement, repair, alteration and maintenance of cold water services…
/editions/2016-a1/ncc-2016-volume-three/section-general-provisions/part-a3-documents-adopted
A3.1 Schedule of referenced documents
ACT, SA, Tas
The Standards and other documents listed in Table A3.1 are referred to in the PCA.
Table A3.1 SCHEDULE OF REFERENCED DOCUMENTS
Document No.
Date
Title
PCA Clause
AS 1056
Storage water…
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E1.1
to E1.10; and
(ii)
in a building containing an atrium, Part G3;…
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E1.1
to E1.10; and
(ii)
in a building containing an atrium, Part G3;…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/part-e1-fire-dts
Deemed-to-Satisfy Provisions
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsEP1.1 to EP1.6 are satisfied by complying with—
(i)
E1.1 to E1.10; and
(…
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment-dts
Deemed-to-Satisfy Provisions
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsEP1.1 to EP1.6 are satisfied by complying with—
(i)
E1.1 to E1.10; and
(…
/have-your-say/regulatory-impact-assessment/decision-regulation-impact-statements
A Decision Regulation Impact Statement (RIS) incorporates comments and feedback from submissions received on the Consultation RIS.
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
Requirements GP4.1 to
GP4.4 are satisfied…
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with—
(i)
G4.1 to G4.9; and
(ii)
for a…
/editions/2016/ncc-2016-volume-three/victoria/section-b-water-services
Part B1 Cold Water Services
After B1.2(c) insert Vic B1.2(d) and (e) as follows:
Vic B1.2 General requirements
(d)
Drinking water that is not intentionally heated must be delivered at a temperature of less than 40 degrees Celsius.
(e…
/editions/2016-a1/ncc-2016-volume-three/victoria/section-b-water-services
Part B1 Cold Water Services
After B1.2(c) insert Vic B1.2(d) and (e) as follows:
Vic B1.2 General requirements
(d)
Drinking water that is not intentionally heated must be delivered at a temperature of less than 40 degrees Celsius.
(e…
/resource/standard/fire-safety-verification-method
This Fire Safety Verification Method provides a process for engineering the design of fire safety Performance Solutions. The document provides the flexibility required to develop Performance Solutions while still maintaining the level of safety…
/editions/2019-a1/ncc-2019-volume-one-amendment-1/south-australia/section-e-services-and-equipment
E1.3 is varied by adding SA E1.3(c), (d), (e) and (f) as follows:
SA E1.3 Fire hydrants
(c)
In a farm building, in
lieu of providing a fire hydrant system in accordance with E1.3(b)(i…
/editions/2019/ncc-2019-volume-one/south-australia/section-e-services-and-equipment
E1.3 is varied by adding SA E1.3(c), (d), (e) and (f) as follows:
SA E1.3 Fire hydrants
(c)
In a farm building, in lieu of providing a fire hydrant system in accordance with E1.3(b)(i), the building may be provided with—
(i)
a fire hydrant…