This report represents the second phase of work and further investigates the methods for sizing sanitary plumbing and drainage systems used within Australia.

08.2023 Report

This report provides commentary on the cost implications of a proposed Deemed to
Satisfy (D-t-S) provision for the requirement of covered balconies to be sprinkler
protected.

07.2021 Report

Consultation draft This report outlines a review of the WaterMark Certification Scheme undertaken by the ABCB in 2014.

07.2021 Report

Summary Report This WaterMark Point of Sale Feasibility Study Summary Report outlines the process, assessment approach, findings and recommendations of the study undertaken in 2018.

07.2021 Report