Skip to main content
  • ABCB
  • NCC Online
  • WaterMark
  • CodeMark
Home
  • Log in
  • Register
  • Reset password
Subscribe
  • Consumers
    • What is WaterMark?
    • Check a product
    • Buying plumbing products
    • Talking to your plumber
  • Plumbing Practitioners
    • What is WaterMark?
    • Check a product
    • Installation and WaterMark Licensing
    • Talking to your customers
    • Lead free plumbing products
  • Certification process
    • Certifying a product
    • WaterMark Conformity Assessment Bodies
    • Becoming a WaterMark Conformity Assessment Body
    • Approved Users or WaterMark Licensees
    • Technical specifications
    • Notices of Direction
    • Schedule of Products
    • Schedule of Excluded Products
    • Lead free plumbing products
  • Have your say
  • About
    • How it works
    • Scheme rules
    • Resource Library
    • History
  • Help & Support

Breadcrumb

  1. Home
  2. Search

Search results

Schedule of Products - Tapware
/schedule-products-tapware

Schedule of Products - Tapware

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Schedule of Products - Fittings – Metallic
/schedule-products-fittings-metallic

Schedule of Products - Fittings – Metallic

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part B5 Cross-connection control
/editions/2019/ncc-2019-volume-three/section-b-water-services/part-b5-cross-connection-control
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Introduction to this Part This Part sets out cross-connection hazards and corresponding Hazard Ratings. Explanatory information: Explanatory information: OBJECTIVE BO5 The Objective of this Part is to— safeguard people from…
Part B5 Cross-connection control
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-b-water-services/part-b5-cross
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Introduction to this Part This Part sets out cross-connection hazards and corresponding Hazard Ratings. Explanatory information: Explanatory information: OBJECTIVE…
Part A3 Documents Adopted By Reference
/editions/2016-a1/ncc-2016-volume-three/section-general-provisions/part-a3-documents-adopted
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
A3.1 Schedule of referenced documents ACT, SA, Tas The Standards and other documents listed in Table A3.1 are referred to in the PCA. Table A3.1 SCHEDULE OF REFERENCED DOCUMENTS Document No. Date Title PCA Clause AS 1056 Storage water…
Section B Water Services
/editions/2016-a1/ncc-2016-volume-three/queensland/section-b-water-services
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part B1 Cold Water Services Delete B1.2(a) and (c) and insert Qld B1.2(a) and (c) as follows: Qld B1.2 General requirements (a) The design, construction, installation, replacement, repair, alteration and maintenance of cold water services…
Part A3 Documents Adopted By Reference
/editions/2016/ncc-2016-volume-three/section-general-provisions/part-a3-documents-adopted-reference
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
A3.1 Schedule of referenced documents ACT, SA, Tas The Standards and other documents listed in Table A3.1 are referred to in the PCA. Table A3.1 SCHEDULE OF REFERENCED DOCUMENTS Document No. Date Title PCA Clause AS 1056 Storage water…
Section B Water Services
/editions/2016/ncc-2016-volume-three/queensland/section-b-water-services
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part B1 Cold Water Services Delete B1.2(a) and (c) and insert Qld B1.2(a) and (c) as follows: Qld B1.2 General requirements (a) The design, construction, installation, replacement, repair, alteration and maintenance of cold water services…
Part E1 Fire Fighting Equipment (Deemed-to-Satisfy Provisions)
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
E1.0 Deemed-to-Satisfy Provisions Tas E1.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with— (i) E1.1 to E1.10; and (ii) in a building containing an atrium, Part G3;…
Part E1 Fire Fighting Equipment (Deemed-to-Satisfy Provisions)
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
E1.0 Deemed-to-Satisfy Provisions Tas E1.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with— (i) E1.1 to E1.10; and (ii) in a building containing an atrium, Part G3;…
Part E1 Fire fighting equipment (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/part-e1-fire-dts
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Deemed-to-Satisfy Provisions E1.0 Deemed-to-Satisfy Provisions Tas E1.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsEP1.1 to EP1.6 are satisfied by complying with— (i) E1.1 to E1.10; and (…
Part E1 Fire fighting equipment (DtS)
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment-dts
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Deemed-to-Satisfy Provisions E1.0 Deemed-to-Satisfy Provisions Tas E1.0 (a) Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsEP1.1 to EP1.6 are satisfied by complying with— (i) E1.1 to E1.10; and (…
WaterMark product specifications
/news/2020/watermark-product-specifications

The PCA requires most products intended for use in plumbing and drainage installations in or around buildings to be evaluated and certified to WaterMark product specifications.

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9. (b) Where a Performance Solution is proposed, the relevant Performance…
Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9. (b) Where a Performance Solution is proposed, the relevant Performance…
Part G4 Construction in alpine areas (DtS)
/editions/2019/ncc-2019-volume-one/section-g-ancillary-provisions/part-g4-construction-alpine-areas-dts
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied by complying with— (i) G4.1 to G4.9; and (ii) for a…
Part G4 Construction in alpine areas (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Deemed-to-Satisfy Provisions G4.0 Deemed-to-Satisfy Provisions (a) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements GP4.1 to GP4.4 are satisfied…
Decision Regulation Impact Statements
/have-your-say/decision-regulation-impact-statements

A Decision Regulation Impact Statement (RIS) incorporates comments and feedback from submissions received on the Consultation RIS.

Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Section B Water Services
/editions/2016-a1/ncc-2016-volume-three/victoria/section-b-water-services
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part B1 Cold Water Services After B1.2(c) insert Vic B1.2(d) and (e) as follows: Vic B1.2 General requirements (d) Drinking water that is not intentionally heated must be delivered at a temperature of less than 40 degrees Celsius. (e…
Section B Water Services
/editions/2016/ncc-2016-volume-three/victoria/section-b-water-services
Licence Number:
Licencee:
Specification:
Certifier Name:
Trading Name:
Certifier:
Contact Name:
Licencee Name:
Trading Name:
Certificate:
Model Name:
Brand Name:
Model ID:
Part B1 Cold Water Services After B1.2(c) insert Vic B1.2(d) and (e) as follows: Vic B1.2 General requirements (d) Drinking water that is not intentionally heated must be delivered at a temperature of less than 40 degrees Celsius. (e…

Pagination

  • Page 1
  • Page 2
  • Page 3
  • Page 4
  • Page 5
  • Page 6
  • Page 7
  • Page 8
  • Page 9
  • …
  • Next page Next ›
  • Last page Last »

Areas of Interest

  • Energy efficiency (5)
  • NCC compliance (3)
  • Performance (3)
  • Access and egress (1)
  • Building services (1)
  • Fire safety (1)
  • Health and amenity (1)
  • Plumbing and drainage (1)

Content type

  • Show all (250)
  • NCC Page (209)
  • Article (18)
  • Page (11)
  • NCC Navigator Page (3)
  • PCD (3)
  • Page (CPD) (1)
  • (-) Resource (5)

Domain

File type

Get the latest news and articles from the ABCB delivered straight to you. Subscribe to ABCB communications here

In the spirit of reconciliation the Australian Building Codes Board acknowledges the Traditional Custodians of country throughout Australia and their connections to land, sea and community. We pay our respect to their elders past and present and extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Home

Info

  • Copyright
  • Privacy
  • Disclaimer
  • Accessibility
  • Help & Support

Find us on:

  • Facebook
  • LinkedIn
  • Youtube