RIS Fire hose OBPR
/resource/regulation-impact-statements/ris-fire-hose-obpr
This Regulation Impact Statement (RIS) assesses the costs and benefits of fire hose reels in new residential buildings, noting the findings of a thesis conducted in 2009 on the value of hose reels in residential buildings and the ARUP qualitative fire…
ARUP provision of fire hose reels in class 5 buildings fire risk assessment
/resource/report/arup-provision-fire-hose-reels-class-5-buildings-fire-risk-assessment
This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 233884-73 Arup Arup…
Final RIS Assessment of the NCC's fire hose reel requirements for Class 5 office buildings
/resource/regulation-impact-statements/final-ris-assessment-nccs-fire-hose-reel-requirements-class-5-office-buildings
Final Decision RIS This final Regulation Impact Statement (RIS) assesses the costs and benefits of requiring fire hose reels in (Class 5) office buildings. The Final RIS has been updated to reflect feedback received during the consultation period from…
/schedule-products-tapware
Schedule of Products - Tapware
/schedule-products-fittings-metallic
Schedule of Products - Fittings – Metallic
Part B5 Cross-connection control
/editions/2019/ncc-2019-volume-three/section-b-water-services/part-b5-cross-connection-control
Introduction to this Part
This Part sets out cross-connection hazards and corresponding Hazard Ratings.
Explanatory information:
Explanatory information:
OBJECTIVE
BO5
The Objective of this Part is to—
safeguard people from…
Part B5 Cross-connection control
/editions/2019-a1/ncc-2019-volume-three-amendment-1/section-b-water-services/part-b5-cross
Introduction to this Part
This Part sets out cross-connection hazards and corresponding Hazard Ratings.
Explanatory information:
Explanatory information:
OBJECTIVE…
Part A3 Documents Adopted By Reference
/editions/2016/ncc-2016-volume-three/section-general-provisions/part-a3-documents-adopted-reference
A3.1 Schedule of referenced documents
ACT, SA, Tas
The Standards and other documents listed in Table A3.1 are referred to in the PCA.
Table A3.1 SCHEDULE OF REFERENCED DOCUMENTS
Document No.
Date
Title
PCA Clause
AS 1056
Storage water…
Section B Water Services
/editions/2016/ncc-2016-volume-three/queensland/section-b-water-services
Part B1 Cold Water Services
Delete B1.2(a) and (c) and insert Qld B1.2(a) and (c) as follows:
Qld B1.2 General requirements
(a)
The design, construction, installation, replacement, repair, alteration and maintenance of cold water services…
Section B Water Services
/editions/2016-a1/ncc-2016-volume-three/queensland/section-b-water-services
Part B1 Cold Water Services
Delete B1.2(a) and (c) and insert Qld B1.2(a) and (c) as follows:
Qld B1.2 General requirements
(a)
The design, construction, installation, replacement, repair, alteration and maintenance of cold water services…
Part A3 Documents Adopted By Reference
/editions/2016-a1/ncc-2016-volume-three/section-general-provisions/part-a3-documents-adopted
A3.1 Schedule of referenced documents
ACT, SA, Tas
The Standards and other documents listed in Table A3.1 are referred to in the PCA.
Table A3.1 SCHEDULE OF REFERENCED DOCUMENTS
Document No.
Date
Title
PCA Clause
AS 1056
Storage water…
Part E1 Fire Fighting Equipment (Deemed-to-Satisfy Provisions)
/editions/2016-a1/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E1.1
to E1.10; and
(ii)
in a building containing an atrium, Part G3;…
Part E1 Fire Fighting Equipment (Deemed-to-Satisfy Provisions)
/editions/2016/ncc-2016-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with—
(i)
E1.1
to E1.10; and
(ii)
in a building containing an atrium, Part G3;…
Part E1 Fire fighting equipment (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-e-services-and-equipment/part-e1-fire-dts
Deemed-to-Satisfy Provisions
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsEP1.1 to EP1.6 are satisfied by complying with—
(i)
E1.1 to E1.10; and
(…
Part E1 Fire fighting equipment (DtS)
/editions/2019/ncc-2019-volume-one/section-e-services-and-equipment/part-e1-fire-fighting-equipment-dts
Deemed-to-Satisfy Provisions
E1.0 Deemed-to-Satisfy Provisions
Tas E1.0
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance RequirementsEP1.1 to EP1.6 are satisfied by complying with—
(i)
E1.1 to E1.10; and
(…
/news/2020/watermark-product-specifications
The PCA requires most products intended for use in plumbing and drainage installations in or around buildings to be evaluated and certified to WaterMark product specifications.
/have-your-say/regulatory-impact-assessment/decision-regulation-impact-statements
A Decision Regulation Impact Statement (RIS) incorporates comments and feedback from submissions received on the Consultation RIS.
Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016-a1/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
Part G4 Construction in Alpine Areas (Deemed-to-Satisfy)
/editions/2016/ncc-2016-volume-one/section-g-ancilliary-provisions/part-g4-construction-alpine-areas
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements to are satisfied by complying with G4.1 to G4.9.
(b)
Where a Performance Solution is proposed, the relevant Performance…
Part G4 Construction in alpine areas (DtS)
/editions/2019-a1/ncc-2019-volume-one-amendment-1/section-g-ancillary-provisions/part-g4-dts
Deemed-to-Satisfy Provisions
G4.0 Deemed-to-Satisfy Provisions
(a)
Where a Deemed-to-Satisfy
Solution is proposed, Performance
Requirements GP4.1 to
GP4.4 are satisfied…