NCC 2022 Volume Three - Plumbing Code of Australia
Search the National Construction Code editions
Filter
E3
VIC Part E3 Stormwater - Roof drainage systems
VIC Part E3 Stormwater - Roof drainage systems
Introduction to this Part
This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a roof drainage system
VIC E3O1 Objective2019: FO1
The Objective of this Part is to—
safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a roof drainage installation; and
ensure that a roof drainage installation is adequate; and
conserve water and energy; and
safeguard the environment; and
safeguard public and private infrastructure; and
ensure that a roof drainage installation is designed and is capable of being maintained so that throughout its serviceable life it will continue to satisfy Objectives (a) to (e).
Buildings are to be provided with a roof drainage installation constructed to provide protection for people, property and the environment from the adverse effects of stormwater.
The design, construction, installation, replacement, repair, alteration and maintenance of a roof drainage system must be in accordance with AS/NZS 3500.3 and SA HB 39, subject to following:
Insert Clause 4.9.6.3 Fastening in AS/NZS 3500.3 as follows: Dowpipes to be securely fastened to walls and structures so as to withstand movement due to thermal expansion or weight due to a partial or total blockage, and
Where there are any conflicts between AS/NZS 3500.3 and SA HB 39, AS/NZS 3500.3 prevails.