NCC 2022 Volume One - Building Code of Australia Class 2 to 9 buildings
Classification
Building class 1a Building class 1b Building class 2 Building class 3 Building class 4 Building class 5 Building class 6 Building class 7a Building class 7b Building class 8 Building class 9a Building class 9b Building class 9c Building class 10a Building class 10b Building class 10c

Filter

Classification
Building class 1a Building class 1b Building class 2 Building class 3 Building class 4 Building class 5 Building class 6 Building class 7a Building class 7b Building class 8 Building class 9a Building class 9b Building class 9c Building class 10a Building class 10b Building class 10c

J4

Part J4 Building fabric

Part J4 Building fabric

NSW J4D1 Deemed-to-Satisfy Provisions2019: J1.0

Delete subclause J4D1(1) and insert NSW J4D1(1) as follows:

(1) Where a Deemed-to-Satisfy Solution is proposed, Performance Requirements NSW J1P1 to NSW J1P7 are satisfied by complying with—

  1. NSW J2D2; and
  1. NSW J3D2 to J3D10; and
  2. NSW J4D2 to J4D7; and
  3. NSW J5D2 to J5D8; and
  4. NSW J6D2 to J6D13; and
  5. NSW J7D2 to J7D9; and
  6. J8D2 to NSW J8D4; and
  7. J9D2 to J9D5.

NSW J4D2 Application of Part2019: J1.1, NSW J(A)1.1

Delete clause J4D2 and insert NSW J4D2 as follows:

(1) The Deemed-to-Satisfy Provisions of this Part apply to building elements forming the envelope of a Class 3 and Class 5 to 9 building.

(2) NSW J4D3, applies to building elements forming the envelope of a sole-occupancy unit in a Class 2 building and a Class 4 part of a building.

(3) (2) only applies to thermal insulation in a sole-occupancy unit in a Class 2 building and a Class 4 part of a building where a development consent specifies that the insulation is to be provided as part of the development.

NSW J4D3 Thermal construction—general2019: J1.2, NSW J(A)1.2

Delete clause J4D3 and insert NSW J4D3 as follows:

(1) Where required, insulation must comply with AS/NZS 4859.1 and be installed so that it—

  1. abuts or overlaps adjoining insulation other than at supporting members such as studs, noggings, joists, furring channels and the like where the insulation must be against the member; and
  2. forms a continuous barrier with ceilings, walls, bulkheads, floors or the like that inherently contribute to the thermal barrier; and
  3. does not affect the safe or effective operation of a service or fitting.

(2) Where required, reflective insulation must be installed with—

  1. the necessary airspace to achieve the required R-Value between a reflective side of the reflective insulation and a building lining or cladding; and
  2. the reflective insulation closely fitted against any penetration, door or window opening; and
  3. the reflective insulation adequately supported by framing members; and
  4. each adjoining sheet of roll membrane being—
    1. overlapped not less than 50 mm; or
    2. taped together.

(3) Where required, bulk insulation must be installed so that—

  1. it maintains its position and thickness, other than where it is compressed between cladding and supporting members, water pipes, electrical cabling or the like; and
  2. in a ceiling, where there is no bulk insulation or reflective insulation in the wall beneath, it overlaps the wall by not less than 50 mm.

(4) Roof, ceiling, wall and floor materials, and associated surfaces are deemed to have the thermal properties listed in Specification 36.

(5) The required Total R-Value and Total System U-Value, including allowance for thermal bridging, must be—

  1. calculated in accordance with AS/NZS 4859.2 for a roof or floor; or
  2. determined in accordance with Specification 37 for wall-glazing construction; or
  3. determined in accordance with Specification 39 or Section 3.5 of CIBSE Guide A for soil or sub-floor spaces.

Notes

Where required is deemed to refer to “Where a development consent specifies that insulation is to be provided as part of the development.”.

NSW J4D6 Walls and glazing2019: J1.5

Delete clause J4D6 and insert NSW J4D6 as follows:

(1) The Total System U-Value of wall-glazing construction, including wall-glazing construction which wholly or partly forms the envelope internally, must not be greater than—

  1. for a Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area, U2.0; and
  2. for a Class 3 or 9c building or a Class 9a ward area
    1. in climate zones 1, 3, 4, 6 or 7, U1.1; or
    2. in climate zones 2 or 5, U2.0; or
    3. in climate zone 8, U0.9.

(2) The Total System U-Value of display glazing must not be greater than U5.8.

(3) The Total System U-Value of wall-glazing construction must be calculated in accordance with Specification 37.

(4) Wall components of a wall-glazing construction must achieve a minimum Total R-Value of—

  1. where the wall is less than 80% of the area of the wall-glazing construction, R1.0; or
  2. where the wall is 80% or more of the area of the wall-glazing construction, the value specified in NSW Table J4D6a.

(5) The solar admittance of externally facing wall-glazing construction, excluding wall-glazing construction which is wholly internal, must not be greater than—

  1. for a Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area, the values specified in NSW Table J4D6b; and
  2. for a Class 3 or 9c building or a Class 9a ward area, the values specified in NSW Table J4D6c.

(6) The solar admittance of a wall-glazing construction must be calculated in accordance with Specification 37.

(7) The Total system SHGC of display glazing must not be greater than 0.81 divided by the applicable shading factor specified in S37C7.

Insert NSW table (NSW J4D6a) J4D6 as follows:
NSW Table NSW J4D6a: Minimum wall Total R-Value - Wall area 80% or more of wall-glazing construction area
Climate zone Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area Class 3 or 9c building or Class 9a ward area
1 2.4 3.3
2 1.4 1.4
3 1.4 3.3
4 1.4 2.8
5 1.4 1.4
6 1.4 2.8
7 1.4 2.8
8 1.4 3.8
Insert NSW table (J4D6b) J4D6 as follows:
NSW Table J4D6b: Maximum wall-glazing construction solar admittance - Class 5, 6, 7, 8 or 9b building or Class 9a building other than a ward area
Climate zone Eastern aspect solar admittance Northern aspect solar admittance Southern aspect solar admittance  Western aspect solar admittance
1 0.12 0.12 0.12 0.12
2 0.13 0.13 0.13 0.13
3 0.16 0.16 0.16 0.16
4 0.13 0.13 0.13 0.13
5 0.13 0.13 0.13 0.13
6 0.13 0.13 0.13 0.13
7 0.13 0.13 0.13 0.13
8 0.2 0.2 0.42 0.36
Table J4D6c Maximum wall-glazing construction solar admittance - Class 3 or 9c building or Class 9a ward area
Climate zone Eastern aspect solar admittance Northern aspect solar admittance Southern aspect solar admittance Western aspect solar admittance
1 0.07 0.07 0.10 0.07
2 0.10 0.10 0.10 0.10
3 0.07 0.07 0.07 0.07
4 0.07 0.07 0.07 0.07
5 0.10 0.10 0.10 0.10
6 0.07 0.07 0.07 0.07
7 0.07 0.07 0.08 0.07
8 0.08 0.08 0.08 0.08
Insert NSW table (NSW J4D6a) J4D6 as follows:
NSW Table NSW J4D6a: Minimum wall Total R-Value - Wall area 80% or more of wall-glazing construction area
Climate zone Class 5, 6, 7, 8 or 9b building or a Class 9a building other than a ward area Class 3 or 9c building or Class 9a ward area
1 2.4 3.3
2 1.4 1.4
3 1.4 3.3
4 1.4 2.8
5 1.4 1.4
6 1.4 2.8
7 1.4 2.8
8 1.4 3.8
Insert NSW table (J4D6b) J4D6 as follows:
NSW Table J4D6b: Maximum wall-glazing construction solar admittance - Class 5, 6, 7, 8 or 9b building or Class 9a building other than a ward area
Climate zone Eastern aspect solar admittance Northern aspect solar admittance Southern aspect solar admittance  Western aspect solar admittance
1 0.12 0.12 0.12 0.12
2 0.13 0.13 0.13 0.13
3 0.16 0.16 0.16 0.16
4 0.13 0.13 0.13 0.13
5 0.13 0.13 0.13 0.13
6 0.13 0.13 0.13 0.13
7 0.13 0.13 0.13 0.13
8 0.2 0.2 0.42 0.36