TAS Part I15 Premises for lead processing
Introduction to this Part
This Part contains additional requirements for premises used for lead processing.
Deemed-to-Satisfy Provisions
NCC Blurbs
(1) This Part is applicable to every building in which lead processes are used.
(2) Premises used for lead processing must—
- provide for the safety and comfort of workers; and
- be constructed in a manner that will minimise the lodgement of dust and must be capable of being flushed with water.
NCC SPTC Current
Application of Part
NCC ID
_d07167af-e977-4a53-9912-adb42625c8a6
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
(1) The floor of every work place where a lead process is used must be—
- so constructed of concrete or other suitable material as to be smooth and impervious to fluids; and
- graded and properly drained to permit flushing with water.
(2) The mater of which the floor is constructed must be applied to the walls to a height of not less than 75 mm in such a fashion that the angle between the walls and the floor is coved for easy cleaning.
NCC ID
_0cce8a77-deff-41c5-a1e2-b09caa2450e2
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
Every part of a lead processing area must be not less than 2.7 m in height—
- where a ceiling is provided, measured from the floor to the ceiling; or
- where a ceiling is not provided, measured from the floor to the lowest part of the roof.
NCC Title
Height of lead processing areas
NCC SPTC Current
Height of lead processing areas
NCC ID
_38442ab0-5641-44d9-8123-a53f598e4117
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
(1) In every lead processing area there must be not less than 14 m3 of air space for each person employed therein, and in the calculation of such space the maximum height taken must be not greater than 4.2 m.
(2) The total floor space for the persons employed in such area, exclusive of space used for storage, must be not less than 3.3 m2 for each person so employed.
NCC Title
Air space and floor space
NCC SPTC Current
Air space and floor space
NCC ID
_c2c29133-7831-4d75-b1f8-2158b3374c2a
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
(1) The inner surfaces of the walls of every lead processing area must be of a smooth material impervious to fluids and must not contain any projections on which dust may lodge.
(2) The interior construction of the ceiling or roof must, so far as is practicable, be such that dust will not settle on it.
NCC Title
Interior of lead processing areas
NCC SPTC Current
Interior of lead processing areas
NCC ID
_bf7ef006-ce62-4243-a165-3df4e79d3bcf
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
Any areas in which dust-forming lead particles are manipulated, moved or treated must be served by a mechanical exhaust ventilation system capable of safely and effectively collecting all dust.
NCC SPTC Current
Dust collection
NCC ID
_eb152635-8188-4cb9-8ba8-a3dcd6861460
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
Where any process of pasting of electric accumulator plates or drying of paste plates, or melting down of pasted plates or of formation with tacking in the electric accumulator industry or of manipulation of dry oxide or lead, is to be carried out in the same room as any other lead process, the process of pasting, drying, melting, formation or manipulation must be isolated from one another and from any other lead process—
- by a partition extending from the floor to the ceiling in the case of a room having a ceiling not more than 3.6 m in height, or to a height of 2.7 m in any other case; or
- by some other suitable method.
NCC Title
Isolation of certain processes
NCC SPTC Current
Isolation of certain processes
NCC ID
_1d9f16b0-4e20-4f2a-a8f5-62384b98aee2
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
The racks or shelves provided in any drying room must be not more than 2.6 m from the floor nor more than 650 mm in width except that, in the case of racks or shelves set or drawn from both sides, the total width must not exceed 1.3 m.
NCC SPTC Current
Drying room shelves
NCC ID
_92446aca-9b06-4a34-a498-8be80ff3f3f6
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
Washing facilities served with running hot and cold water for the use of all employees engaged in a lead process must be provided consisting of—
- one washbasin for each 5 employees, or part thereof; and
- one shower bath for each 8 employees, or part thereof.
NCC SPTC Current
Washing facilities
NCC ID
_6e040eee-b22d-4d61-94d3-28288f364456
Building Classes
1a,1b,10a,10b,10c
NCC Blurbs
In every work place in which lead is processed there must be provided two suitable furnished change rooms for the use of employees as follows—
- one of the change rooms must be used for taking off, storing, and putting on of the street clothing of employees; and
- the other of the change rooms must be used for taking, storing, and putting on of overalls or other clothing work in any work room; and
- each change room must be so constructed and situated as to prevent the entry into the room of dust and fumes generated in a work room; and
- each change room must be in close proximity to the washing facilities required in TAS I15D9.
NCC SPTC Current
Change rooms
NCC ID
_8f0dd9e6-8bf5-4a34-94f9-22bdca797f12
Building Classes
1a,1b,10a,10b,10c